Rolleston Recovery Park – 2023

Rolleston Recovery Park – 2023

Selwyn District Council engaged Procerto to assess conditions of the main building in Rolleston Recovery Park and to provide options to strengthen the building so it can meet the latest standard for building seismic protection.  
Sterling Retirement Village – 2020 ongoing

Sterling Retirement Village – 2020 ongoing

The Sterling is a retirement village located in the Silverstream Estate, in Kaiapoi, which at completion, will include 81 independent living units, 269 independent living apartments within seven multi-storey buildings, 48 residential aged care rooms, 36 dementia care...
Millstead Oaks Subdivision – 2022 ongoing

Millstead Oaks Subdivision – 2022 ongoing

Millstead Oaks is a 56-lot residential subdivision in Christchurch including two roads vested in council’s, two right-of-ways, a naturalised open channel drain and a grassed first flush basin. Procerto was engaged as consulting engineer to provide a complete civil...
Brookvale Subdivision – 2022 ongoing

Brookvale Subdivision – 2022 ongoing

Brookvale is a 263-lot residential subdivision in Lincoln including seventeen roads to vest with council, two right-of-ways and multiple local purpose and recreation reserves. Procerto was engaged as consulting engineer to provide a complete civil engineering solution...
Romano’s Pizza Factory Survey – 2022

Romano’s Pizza Factory Survey – 2022

Romano’s Pizza Factory was demolished and required a rebuilt on the same site. The total building area is approximately 2600m2, with building sides of 55m long. Procerto was engaged to provide surveying services for the project including covered cadastral surveying,...